Free tool · No sign-up
Bay capacity planner
Figure out how many bays your workshop needs — or how much headroom you have on your current capacity — based on job volume and average service time.
Your workshop
How it works: Needed bay-hours = jobs × avg time. Each bay gives you (hours × target utilisation) productive hours per day. Divide to get the number of bays you need. Target 75-85% utilisation for healthy operations.
Bays needed
10.4
To handle 30 jobs/day at 80% util
Required bay-hours/day75.0
Your current capacity17.3 jobs/day
Current status
Overloaded
Utilisation: 138.9%
You are turning away jobs or delivering late.
Get live bay utilisation on every job
GetAFix tracks every bay-hour in real time — overbooked, idle, or healthy.